Most of the railway lines in Indonesia use a ballasted track system, including the Jember–Kalisat line in Operational Area IX Jember which is the location of this research. The rail structure consists of a superstructure (rails, tethers, sleepers) and a substructure (ballast layer, sub-ballast, subgrade), which must meet technical specifications according to PM 60 of 2012. The ballast layer is the initial layer that receives load distribution from the upper structure, so it requires routine maintenance to maintain stability. This research aims to estimate the decline in the ballast layer due to annual loads using a quantitative approach. The calculation results show that the annual tonnage on the Jember–Kalisat segment is 17,328,960 tons/year, which is in accordance with class II route specifications. Field measurements at five sample points showed that the ballast thickness did not meet the standard, namely 30 cm, so it was estimated that there would be a greater decrease compared to standard conditions. The largest estimated decrease occurred at KM 202+200 to KM 202+300, with a decrease of 4.06 cm per year upstream and 3.36 cm per year downstream. This calculation also produces an estimated graph of ballast layer reduction based on annual tonnage. It is hoped that this research can provide important recommendations regarding ballast layer maintenance to maintain railway track stability.

Downloads

Download data is not yet available.

References

Ernest Theodore Selig, J.M.W. (1994) Track Geotechnology and Substructure Management.

Fatikhandi, A. et al. (2023) “Estimasi Penurunan Lapisan Balas Akibat Tonase Tahunan (Passing Tonage) Pada Petak Jalan Yogyakarta-Patukan,” Prosiding Forum Studi Transportasi antar Perguruan Tinggi, 10(1), hal. 174–184.

KAI, P. (2016) PD 10A Perawatan Jalan Rel.

Kementrian Perhubungan (2011) “Peraturan Menteri Perhubungan No 32 Tahun 2011 tentang Standar dan Tata Cara Perawatan Prasarana Perkeretaapian,” Kelas dan Kegiatan Di Stasiun Kereta Api, hal. 2. Tersedia pada: https://peraturan.bpk.go.id/Home/Details/106032/permenhub-no-33-tahun-2011.

Masoudi Nejad, R. et al. (2021) “Reliability analysis of fatigue crack growth for rail steel under variable amplitude service loading conditions and wear,” International Journal of Fatigue, 152, hal. 106450. doi:10.1016/j.ijfatigue.2021.106450.

Menteri Perhubungan Republik Indonesia (2012) “Peraturan Menteri Perhubungan Nomor 60 Tahun 2012 tentang Persyaratan Teknis Jalur Kereta Api,” Kementrian Perhubungan Republik Indonesia, hal. 1–57. Tersedia pada: https://peraturan.bpk.go.id/Download/138947/pm_no._60_tahun_2012.pdf.

Muhtarom, Z. dan Ratih, S.Y. (2021) “Analisis Kondisi Jalan Rel Kereta Api Pada Lintas Sragen-Solo Berdasarkan Nilai Track Quality Indeks (TQI),” Jurnal Teknik Sipil, 17(1), hal. 01–13. doi:10.28932/jts.v17i1.3440.

PERHUBUNGAN, K. (2023) “Grafik Perjalanan Kereta Api Jaringan Jalur Kereta Api Nasional Di Jawa,” Kementerian Perhubungan Direktorat Jenderal Perkeretaapian, hal. 1887.

PJKA (1986) “Peraturan Dinas No. 10 Tahun 1986 Tentang Perencanaan Kontruksi Jalan Rel,” Perusahaan Jawatan Kereta Api [Preprint].

Pujiyulianto, E. et al. (2022) “Analisis Struktur Mikro dan Kekuatan Aus Rel Kereta Api Tipe R54 Divre IV Tanjung Karang,” Metal Indonesia, 44(2), hal. 67. doi:10.32423/jmi.2022.v44.67-74.

Roberto, O. dan Mardiaman (2022) “Analisis Metode Pelaksanaan Perawatan Geometri Jalan Rel Pada Lintasan Lurus Terhadap Kualitas, Waktu dan Sumber Daya Manusia,” Jurnal Teknik Sipil [Preprint].

Rosyidi, S.A.P. (2015) “Rekayasa Jalan Kereta Api,” hal. 1–23.

Silalahi, J. et al. (2017) “Pengaruh Variasi Jarak Tulangan Horizontal Dan.”

Surasno, S. dan Tjahjohartoto, B. (2019) “Analisis Kegagalan Dongkrak Rel Kereta Api Kapasitas 10 Ton,” Jurnal Teknologi Bahan dan Barang Teknik, 4(1), hal. 35. doi:10.37209/jtbbt.v4i1.45.

Utomo, S.H.T. (2009) JALAN REL.

Zakirullah. M Fajriansyah. D, A.R. (2021) “Civil Engineering Collaboration Civil Engineering Collaboration,” Civil Engineering Collaboration, 6(2), hal. 53–63. doi:10.35134/jcivil.v9i2.75.

Downloads

Published

2025-02-06

How to Cite

Pradana, P. A. C., Fitriana Purnamasari, & Achmad Dzulfiqar Alfiansyah. (2025). Analisis Penurunan Ballast Akibat Beban Tahunan Kereta Api (Passing Tonnage) Pada Segmen Jember - Kalisat: Analysis Of Ballast Settlement Due To Annual Train Loads (Passing Tonnage) On The Jember - Kalisat Segment. Media Ilmiah Teknik Sipil, 13(1), 9–17. Retrieved from https://ojs.umpr.ac.id/mits/article/view/8835